Северсталь метиз

energy supply

The following resources could be provided to the park residents at competitive prices ( entry/production points are marked ) Parameters of resources conform with the requirements of Russian standards.


Electricity (power 80 MW)
Saturated steam – own generation (capacity 68 Gcal/hour)
Natural gas (capacity 35 000 m3/hour)
Heating water – own generation

Tecnical water – own water-pipe and cycle (capacity 2 500 m3/hour)

Compressed air – own generation (capacity 8 500 m3/hour)

Heating water – own generation

Domestic sewage

 
YOU ARE HERE : Home